Large construction site in Stratford, East London: Case Study

March 2009

WPL SAF tanks at Olympic Village

Filter refurbishment program for 2000 site workers/staff

Site Contractor: Natta Building Company

Peak flow to treatment: 10.5l/s

Designed consent standard: 20 mg/l BOD, 30 mg/l TSS & 10 mg/l NH4

Maximum incoming BOD: 380 mg/l

Maximum incoming NH4: 50 mg/l

Units supplied:

4 off 300pe GRP units

1 off 750pe steel unit

2 off HB50 Lamella settling tanks (primary and final tanks)

The above units were purchased by the contractor due to the lengthy construction period; the portable units provided a complete waste water treatment process capable of achieving the above consent standard.

Raw sewage influent will be pumped to the inlet of the lamella plate primary settlement tank (LPPST) where it is anticipated 30% of the BOD load will settle out. After primary settlement the outlet flow will leave the LPPST via multiple outlet connections which effectively split the flow into equal streams. The LPPST is equipped with baffles to prevent any floating scum entering the biological phase of the treatment. Sludge is periodically transferred to a separate sludge storage tank utilising an actuated valve on the sludge outlet point.

After primary settlement the flows will split (under full loading conditions) and flow under gravity to one of the SAF bio-treatment streams consisting of multiple T300 SAF biological treatment tanks, and the two streams re-combine to flow into one single T750 unit. These tanks are of the submerged bed aerated filter type (SAF) and are each split into several chambers each filled with high voidage plastic media. Whilst passing through these chambers both carbonaceous and nitrifying processes take place. Air to oxidise the influent and to scour excess biomass from the filter media is introduced continuously below each chamber by a series of diffusers. Each diffuser is capable of being removed for maintenance without the necessity to shut down the plant.

For more information regarding products and services, contact Oliver Starr on 07825746623 or oliver.starr@wpl.co.uk


NEWS UPDATE AND CASE STUDIES

WPL has won the Builders' Merchants Awards for Exellence "Supplier of the Year 2009"
For the full story and more information on the Builders Merchants Excellence Awards click the above link...

November 2009

WPL Ltd - E.On On-site Sewage Treatment Plant: Case Study Ratcliffe-on-Soar
In March 2008 WPL Limited were contacted by E.On to enquire about a replacement sewage treatment solution to serve personnel located at the site's Technology Centre and Main Power Station...
May 2009

WPL Ltd wins contract to supply Farne Salmon and Trout with a substantial new effluent treatment plant
A new effluent treatment plant designed by WPL is ensuring that Farne Salmon and Trout Ltd...complies with tighter local trade effluent discharge regulations...
March 2009 

WPL Ltd - Large Construction site in Stratford, East London Case Study
The above units were purchased by the contractor due to the lengthy construction period; the portable units provided a complete wastewater treatment process...
March 2009 

CASE STUDIES ARCHIVE 

WPL Ltd offers Wastewater Treatment When and Where you need it
WPL Limited offers large scale wastewater treatment equipment, and its range of transportable wastewater treatment modules offer a safe, convenient and cost-effective solution whenever and wherever its needed...
March 2009 

WPL Partners Radian in Water Efficiency Project
Radian, a major provider of social housing and support in the south of England, brings together experience of building, regenerating and managing sustainable homes and environments...
March 2009 

WPL achieves high standards
Since the introduction of The Code for Sustainable Homes, demand from Developers is growing for water efficient products...
February 2009 

WPL's Diamond Sewage Treatment Offers Clear Benefits
Since compliance with BS EN 12566-3:2005 became mandatory in July 2008, sellers of all small wastewater treatment systems (up to 50 population equivalent), must ensure that the products they offer do comply...
February 2009 

 NEWS ARCHIVE

Human Resources

Brochures and Manuals Brochures
Events
Subscribe
Contact me
Back