Kirkcowan, Scottish Water
March 2009

A relatively small existing treatment works (549 pe) that required complete refurbishment, the following equipment was supplied by WPL for the duration of the refurbishment:
2 off ST500 (Steel) SAF units (2 off units required to treat the 6 x DWF as requested by SEPA)
1 off HB50 Transportable Lamella settling unit/primary tank.
Deign parameters (original)
|
Unit |
|
Comment |
|
Population Equivalent |
No |
549 |
Domestic only, no trade |
|
DWF |
1/sec |
2.9 |
|
|
Flow to Full Treatment |
1/sec |
4.9 |
Instantaneous pumped flow to be treated by SAF plant |
|
Influent BOD |
Kg/day |
32.9 |
At ADF |
|
Influent SS |
Kg/day |
41.2 |
At ADF |
|
Influent NH3-N load |
Kg/day |
4.4 |
At ADF |
|
Primary tank design effluent BOD load |
Kg/day |
25 |
N/A |
|
Primary tank design effluent SS load |
Kg/day |
22.2 |
N/A |
|
Primary tank Effluent NH3-N |
Kg/day |
4.4 |
N/A |
|
Works Consented Effluent BOD load |
Mg/l |
20 |
95%ile composite samples |
|
Works Consented Effluent SS load |
Mg/l |
30 |
95%ile composite samples |
|
Effluent NH3 |
Mg/l |
N/A |
Not considered for sizing plant |
During the rental period the units performed without fault and satisfactorily achieved the required discharge consent standard of 60:40 (BOD: SS)